Frontier 01
Thomson’s first fabrication plant, opening in 2027. Software, robotics and steel, engineered as one. Today we take structural steel jobs from precon to turnover.
Iron melts at 1,538 °C.1
-
1,538 °C
Every steel beam was once liquid.
T = T₀ + Q / (4πkt) · e^(−r² / 4αt): heat from a point, spreading through a plate. Calculated, not filmed.
-
1931
With steel, America puts up the Empire State Building in 410 days.2
Lewis Hine, about 1930 to 31 · National Archives 518290
-
1973
US mills pour 137 million tonnes. The record still stands.3
Ingots solved for conduction and radiation, 15 to 90 minutes after pouring. Calculated, not filmed.
-
2018
The mill rebuilds itself around the electric arc. A ton that took 10 hours of labor now takes 1.5.4
Three arcs as steady point sources, superposed: T = T₀ + Σ Q / 2πkRᵢ. Calculated, not filmed.
-
2026
In fab shops, every piece is different. The welding arc is lit about one hour in eight.5
Each row is one welder’s 8-hour shift. Lit means the arc is on: 1 cell in 8 of every row. A simulation, not footage.
-
2027
Frontier 01, our first fabrication plant. Step one.
Frontier 01’s sign, concept: laser-cut squares lit in the pattern of a solved weld (Rosenthal, 21.3 kW at 16 mm/s).
Structural steel, without the wait.
Lead times have reached 40 to 50 weeks in some markets.6 We take a job from precon to turnover, modeled before anything is cut, with the erection engineering to catch problems before they hit the schedule.
Send us one job Run a fab shop? Build steel with usOpening 2027
Build it with us.
We’re early, and we’re hiring engineers, robotics people, fabricators and operators in Atlanta to build Frontier 01.
Send us one job.
Send the drawings. We come back with a price and a date.
Or email jake@thomson.inc.